MK Shrimper
Striker
The effin trains again. I get to the station for the 8.21 and it doesn't appear. I then look on my phone at the live update to see that it has been delayed by 10 minutes. Then an announcement tells us that is is delayed by "...11 minutes. This is due to safety checks being carried out."
Then we're told "...13 minutes. This is due to safety checks being carried out."
Then were told "...15 minutes. This is due to safety checks being carried out."
Then we're told "...17 minutes. This is due to safety checks being carried out."
Then we're told "...19 minutes. This is due to safety checks being carried out."
In the end, at about 21 minutes a different train, that was also supposed to be delayed turned up.
Now, what I would be interested to know is:
a) Why couldn't they carry out the safety checks before the train was due to depart?
b) What kind of safety checks are carried out on a train that is delayed, but still moving, in 2 minute increments?
*******s!
I doubt it was - probably the Engineer's assessment of how long the broken widget needed to be replaced before they had to give up and go to B&Q for a new widget and send a replacement train.