Jam_Man
Life President
http://www.echo-news.co.uk/news/9623575.Sadlers_Farm_boss__Just_have_patience/?ref=mr
Soooo....
Does this meant that the underpass will open allowing traffic from London to cut through to the A130 ?
And then they open up the London bound road later?
If Ive read that correctly then that will make a big difference. The traffic to London isnt that bad, its the evening where its the worst and if they open the underpass up so that traffic can get through then that will help massively.
The New Church Road Bridge, passing over the A13 between Pitsea flyover and Sadlers Farm, will open on April 16, along with the new road linking the A13 Southend-bound to the A130 towards Chelmsford.
Soooo....
Does this meant that the underpass will open allowing traffic from London to cut through to the A130 ?
Finally, the Sadlers Farm Bridge, linking the A13 to the A130 towards Canvey, and the new road between the A130 southbound and the A13 westbound will be completed by the end of spring.
And then they open up the London bound road later?
If Ive read that correctly then that will make a big difference. The traffic to London isnt that bad, its the evening where its the worst and if they open the underpass up so that traffic can get through then that will help massively.