ColinMorrisWalksOnWater
Assistant Head Coach⭐⭐🦐
The Boston pitch looked like grass to me and compared to the surface at Tamworth it's totally different.
So I'll stick my neck out and agree with @shrimperjon and say all the indications, using fertilizer etc. suggest it is turf.
it also looks like they may have a separate 3g pitch that is available to hire as below.
However their main pitch was constructed by a company called Fine - Turf and their site states:
We'll find out for sure Wednesday when we arrive.
So I'll stick my neck out and agree with @shrimperjon and say all the indications, using fertilizer etc. suggest it is turf.
it also looks like they may have a separate 3g pitch that is available to hire as below.
Boston United Football Club
All weather, floodlit 3G pitch available to hire as a whole, half or quarter pitch. The pitch offers a full sized senior 11 v 11 pitch which can be divided into two 7 v 7 pitches, two 9 v 9 pitches or four 5 v 5 pitches. Available 7 days a week, ideal for training and matches.
portal.sportskey.com
However their main pitch was constructed by a company called Fine - Turf and their site states:
Boston United FC
MAIN PITCHJUNE 2020
We have recently completed the construction of the football pitch at Boston United FC's newly constructed Community Stadium. The project commenced in the latter part of 2019 and following a wet winter was completed this summer. The pitch was constructed using the following methodology.- Trim and laser grade the formation.
- Excavate and install a main drain along each touchline.
- Excavate and install secondary drainage perpendicular to the main drains at 5m centres and 250mm deep.
- Laser grade and consolidate a 100mm deep 6mm gravel carpet.
- Laser grade and consolidate a 275mm deep medium sand layer.
- Apply a 28:3:15 controlled release fertiliser and a 0:20:20 pre seed fertiliser.
- Spread and ameliorate fibre concentrate into the top 75mm of the surface.
- Apply a 14:6:8 fertiliser and sow Limagrain MM60.
- Install a concrete base for the 21m3 water tank.
- Install a lockable pump house and multistage 3 phase pump, starter panel and irrigation controller.
- Supply and install a water main and 14 Hunter valve in head sprinklers around the pitch perimeter. These sprinklers have a 27m throw radius.
- Supply and install 6 Hunter turf top sprinklers across the pitch.
- Provide a remote control for the system.